Upcoming Power Industry Events

Hennigan Engineering Co., Inc. and Heat Exchanger Products Corporation (HEPCO) are both pleased to announce that they will attend the following upcoming events:

August 10-13, 2015

AEP  BRO (American Electric Power – Boiler Reliability Optimization) Forum 2015
Greater Columbus Convention Center
Columbus, OH

Come See us at Booth # 1018

August 11-13, 2015

2015 Southern Company – Generation Technical Conference
Birmingham-Jefferson Convention Complex/East Exhibition Hall
Birmingham, AL

We at Hennigan Engineering take pride in representing our exceptional capabilities and services for the power industry.  Please stop by and say hello!

Read More

Video Inspection Services saves customer costly Hospital Shut-down

Boston, MA – June, 2015 Video Inspection Services

Hennigan Engineering Company, Inc. was retained by a National Design/Build Contractor to perform Emergency Response Video Inspection and blockage removal from a municipal pipeline linked to their construction of an addition to an active hospital in downtown Boston, Massachusetts.  The blockage came on unexpectedly during construction and was sufficient to cause back-up into active/occupied spaces within the hospital.

Two other contractors failed to solve the problem after several days of trying, then Hennigan Engineering was called into the situation.  The affected wings of the hospital were in imminent risk of being shut-down by local Public Health officials as well as the City’s Engineering Department.  The municipal pipe was approximately 15 ft. below two heavily travelled city streets.

If Hennigan Engineering was not successful in locating and removing the blockage, our client would have been mandated to excavate the municipal pipe and replace approximately 150 ft. of this 24 in. pipe.  This would have been a significantly detrimental direct cost and project delay cost for our client.

What two other pipeline service contractors failed to achieve over the course of three days; Hennigan Engineering’s specialized crew and equipment achieved in less than one day.  The blockage was found to be comprised of construction debris including PVC pipe segments and whole bricks.  The debris was removed without shut-down of the affected hospital wing or further construction delays.

It is this type of consistently cost-effective and reliable performance by Hennigan Engineering that continues to set the firm above all others.
video inspection 2

 

 

Read More