October of 2022, Hennigan was awarded an outage contract from a major Paperboard manufacturer in Macon, GA. One of Hennigan’s projects within the outage was to clean the main Boiler unit. This boiler system is 30-ft wide x 60-ft long by 200-ft tall. Using Hennigan’s specialized equipment, the boiler cleaning was set-up, executed, torn down, inspected by facility engineers, and ready to go back on-line in a single 12-hour work shift. Hennigan’s use of proprietary remotely operated equipment and tooling, allowed us to accomplish this time sensitive work successfully. This level of performance is what our clients have come to expect, and we take pride in delivering!
Quick Cleaning Turnaround On Critical Boiler Unit At GA Paper Mill Using Our Proprietary Remote Equipment
Related Posts
- Helium Leak Testing Used To Pinpoint Leaks!
Our Helium Leak Detection Team can pinpoint the smallest of leaks!! Mass spectrometer leak testing…
-
Complex Video Inspection – New York Aqueduct System
In the spring of 2018 Hennigan Engineering was sought out by an ENR top 50…
-
Hennigan Engineering brings 650 Megawatt Unit back to full power by removing 46,000 lbs of scale
Hennigan Engineering successfully removes 46,000 lbs of scale using High Pressure Water Jetting Services, bringing a…